Preassembled Blast Rooms Simplify Installation and Slash Media Costs

In operations relying on a heavy flow of single-pass abrasives to air blast large work pieces, the move up to an Empire room typically pays for itself in less than a year. By empowering users to switch from a one-pass abrasive, such as coal slag, to a durable abrasive that recycles many times, Empire rooms slash costs for replacing and disposing of blast media. Per-day savings on a media flow of over two tons exceed $400 in operating costs alone, not to mention the associated environmental and operator-safety dividends accruing from blasting within an enclosure designed specifically for the process.

Continue reading “Preassembled Blast Rooms Simplify Installation and Slash Media Costs”